Start with the governing documents
Check the drawings, municipal specification and engineer-approved test procedure. Confirm the method, limits, equipment, test medium, acceptance values and hold points before scheduling.
Include the segment information
Provide pipe material, diameter, length, connections, isolation points and the installation stage. These details help the crew review what is required and identify missing information early.
Treat safety as part of the method
Testing can involve stored energy, pressurized lines or other hazards. Only trained personnel following the approved procedure should set up and conduct the test. Keep the work area controlled as specified.