01

Identify the target location

Provide the manhole or pipe run identifiers, connection station, CCTV footage and any marked-up drawing. Precise location information helps the rehabilitation team review the proposed work area.

02

Confirm material and procedure requirements

The contract documents should define approved materials, installation steps, quality controls and any limits on the work. Do not assume one product or process is suitable for every defect or pipe condition.

03

Plan the verification record

Agree on the required pre-work and post-work CCTV, observation notes, stills and report format. The project professional determines whether the results meet acceptance criteria.