Confirm the asset
We review the pacp-coded sanitary and storm sewer inspection, access points, run length and the project question the inspection needs to answer.
INSPECTION · SURREY, BC
PACP-coded CCTV inspection for municipal, civil and infrastructure projects. Mainline serves Surrey, Metro Vancouver and the Fraser Valley. Share the project details to confirm scope, equipment and availability.

SERVICE OVERVIEW
Mainline is a PACP-approved contractor supporting municipal, civil construction and infrastructure teams with recorded sewer CCTV, standardized observations and project-ready deliverables. Send the governing specification, pipe inventory, required coding version, file naming rules and portal or MFT upload requirements before scheduling.
HOW THE WORK IS PLANNED
Every site is different. These are the practical steps Mainline reviews with your project contact before the crew is scheduled.
We review the pacp-coded sanitary and storm sewer inspection, access points, run length and the project question the inspection needs to answer.
The crew and suitable camera approach are confirmed against pipe dimensions, access, flow and any cleaning needed first.
Video, observations and any requested PACP-style coding or upload format are agreed before dispatch.
REQUEST CHECKLIST
A few specifics help us check fit, access, equipment and documentation requirements before we book.
REQUEST A PROJECT QUOTE
Send the site, asset, access and timing details. The service is preselected for this page, and you can attach drawings or site photos.
Prefer to talk? Call 778-714-2122Include the service location, line or asset details, access points, desired timing and any drawings or site photos. For this scope, also include the project requirements listed above so Mainline can review equipment and deliverables.
Video, observations and PACP-style coding can be arranged to the project requirements. Mainline is a PACP-approved contractor; confirm the required format and upload method before work begins.
Mainline is a PACP-approved contractor. PACP-style coding, report format and video delivery are confirmed against the project requirements before the inspection.
NEXT STEP
Tell us what you need, where the work is and when you need it.